Chuna & TeakInterior Architecture

The studio

Twelve people,
fourteen projects.

Homes that work on a Tuesday morning, not just in the photographs.

A twelve-person studio in Mumbai. We take on around fourteen projects a year — small enough that the person who draws your plan is the person who walks your site.

The cap is the whole point. A studio taking fifty projects a year has to put a junior on most of them and a project manager between you and the person who drew the plan. At fourteen, the person who measured your flat is the one on site when the carpenter has a question — which is the only reliable way a drawing survives contact with a building.

We work across 6 areas around Mumbai, on flats, weekend houses and small workspaces. We are not the cheapest option and do not try to be; what we sell is a fixed number agreed before drawings start, and a snag list we write ourselves before you see it.

0+
Homes delivered
0yrs
In practice
0
Projects a year, capped
0
Google rating
A sunlit living room with a low sofa facing full-height windows
Sea-Facing Reset — Worli, Mumbai

The order of things

Nothing starts until
the number is agreed.

Five stages, in this order, every time. You always know which one you are in and what has to be true before the next one opens.

  1. First conversation

    A week, usually

    We come to the flat, measure nothing, and mostly listen. By the end of it we can tell you a realistic number and whether we are the right studio for the job. No charge, no drawings.

  2. Survey and layouts

    2 to 3 weeks

    A proper measured survey, then two or three layout options. One gets taken forward. This is the only stage where changing your mind is free, so we push you to use it.

  3. Drawings and specification

    3 to 5 weeks

    Elevations, sections, electrical, lighting, and a written specification naming every material by brand and code. If it is not on this set, it is not in the price.

  4. On site

    10 to 18 weeks

    Our team, our supervision, weekly photographs whether you ask for them or not. One designer stays with the project from here to the end.

  5. Snagging and handover

    2 weeks

    We write the snag list ourselves before you see it, close it, and only then invoice the final stage. It is deliberately large enough to be worth coming back for.

  • Fixed fee, agreed before drawings start
  • One designer stays with you to handover
  • Weekly site photos, whether you ask or not
  • Snag list closed before final payment

About this website

Chuna & Teak is not a real studio.

This is a demonstration build. The practice, its history and its projects are written; the photography is licensed placeholder imagery, not work by anyone named here; the reviews are sample copy under invented names; and the phone number, address and email are placeholders.

Every one of those is a content edit rather than a rebuild — the site reads its text, prices, photographs and contact details out of a single set of data files. Nothing on this page is a claim about a business that exists.

Come and look at the flat with us.

The first visit is free and usually settles whether we are the right studio for the job. If we are not, we will say so.

CallWhatsApp
Message the studio